Free extra work isn't generosity, it's a boundary you never wrote down. Six checks keep the work paid: write the scope line before the job starts, count the revision rounds out loud, charge for the invisible work, sell extra asks as variations, cut scope rather than price when the budget is short, and invoice on the agreed schedule. When an ask goes past the line, the answer is yes, with a price, agreed in writing before the work happens.
Free extra work keeps happening because the quote priced the work and never drew its edges. The client can see a number for the job. Nobody wrote down what the job is, so every ask past it lands as part of the job.
A typical quote has a total and a description. It doesn't say how many rounds are in, whether travel is included, what happens to the raw files, or what a change of brief costs. So when the ask comes ("one more interview while you're here", "just a few tweaks", "can we have the raw footage"), there's no line to point at. Raising a price mid-job feels like a grab and saying no feels like a fight, so the work gets absorbed.
Three jobs show where it ends. A client relationship ended over revision rounds that were never defined: the owner asked for $600 for the extra changes and the client offered $300, take it or leave it (the full case study). An owner with days of travel on a job froze at invoice time because he'd never once mentioned charging for it, and ate it (charging for the invisible work). Another quoted $5,000 and then found the client had meant $5,000 including GST (drop the scope, not the price). Every scope argument you've ever had was really an argument about a line that didn't exist.
The method is six checks. Run them on every quote before it goes out, and keep them running until the last invoice on the job is paid.
Copy and paste: the scope checklist
[ ] Scope line under the total, filled in for this job.
[ ] Revision rounds: two per deliverable, a round defined, a further round priced, count said at every delivery.
[ ] Invisible work priced: travel beyond 60 minutes each way, raw footage delivery, storage, extra time on site, pre-production.
[ ] Extras: the price from the quote, a confirmation sent.
[ ] Budget short: scope moved, rate held.
[ ] Invoices out on the dates on the quote.
The scope line is one block under the quote total that sets the edges of the job. Fill it in once as a template, then edit it per job.
Three rules for filling it. Deliverables carry a length and a format. Anything you can price in advance gets its price on this quote, even when it only applies if used, so the figure exists before the ask. Variation triggers are the usual four: a new location, new interviewees, a change of brief after the script is approved, and a further round of changes. The further round already has its price on the quote, so it sits with the priced lines; the other three are quoted when they come up. Nothing on this list should surprise anyone at invoice time.
Copy and paste: the scope line for the quote
Included: [each deliverable, with its length and format]. [Two] rounds of revisions per deliverable; a round is one consolidated set of changes. Travel within [60] minutes of [base].
Priced above as their own lines: project archive and storage for [12] months from delivery. Applied only if used: travel beyond [60] minutes each way, raw footage organisation and transfer, an additional half day on site, further revision rounds.
Variations, quoted separately and started once you've confirmed them: a new location, new interviewees, a change of brief after script approval, [anything specific to this job].
Payment: [X]% on acceptance, [balance] on [delivery / the agreed date]. Extras and variations are added to the next invoice.
Anything not listed here is quoted separately before it's done.
Keep the revision clause and the four invisible lines on the quote as well.
Say yes, give the price, and send a one-line confirmation for the client to reply to. The "while you're here" ask arrives when you're least able to think, on site with the crew waiting, so the words are decided in advance.
Copy and paste: the "while you're here" script, on site
"Happy to. That's outside what we scoped. [An extra half day on site] is $[Y], the figure on the quote. If that works for you, I'll send a one-line confirmation now and we'll get set up."
If it isn't priced on the quote: "Happy to. That's a variation, so I'll price it now and send it over before we start."
Copy and paste: the confirmation, sent before the work
Confirming today's extra: [one additional interview, an extra half day on site], $[Y] as priced on the quote, added to the [next] invoice. Reply to confirm and we'll go ahead.
If the request is small enough that you'd rather not charge for it, charge nothing on purpose and say so, with the count still running: this one is on us, and the next one is the figure on the quote.
Here's the checklist on one job, in round numbers, adapted from the example quote in How to price a video project: a two-day shoot for a new client, agreed at $11,880. For this version the quote also carries the scope line, with two rounds per deliverable, travel within 60 minutes of base, and raw footage, extra time on site and further rounds priced as their own lines, applied only if used.
Three asks arrive. On the shoot day: "while you're here, can you grab the CEO for a quick piece to camera", which runs to an extra half day. After round two on the main film: a third list of changes. At delivery: "can we have the raw files". The half-day and round figures are round numbers; the raw footage figure is the one an owner put on his quote.
| The ask | Without the scope line | With the scope line |
| Extra half day on site | Absorbed | $1,050, confirmed on the day before the crew reset |
| Round three on the main film | Absorbed | $500, chosen by the client before the project was opened |
| Raw footage organisation and transfer | Absorbed | $1,450, confirmed before the files moved |
| Extras invoiced on top of the agreed $11,880 | $0 | $3,000 |
With the scope line, the three extras go on the invoices at the all-in prices on the quote, on top of the agreed $11,880. Without it, the same three pieces of work were done for nothing. $3,000 is about a quarter of the agreed quote.
The checklist fails in five predictable ways.
If it isn't written on the quote, it isn't included, and anything outside the quote is priced and agreed in writing before the work starts. The benchmark: two rounds per deliverable, the four invisible lines priced on the quote, and every invoice out on the date the quote says.
Which of these have you taken on or put in place recently?
What's the one thing you can commit to implementing this week? If you're not sure, start here.
Paste the scope line into your quote template with your own deliverables, your round count and your extras priced, even at placeholder figures. Then go back to the last job you delivered, list each ask you absorbed, and put your day rate against it.
One thing executed every week creates 50 strategic moves a year.
Questions like these come up regularly on our weekly Elite Boardroom calls. If you'd like someone to hold you to account each week, and to learn from a group of peers who run video businesses too, the Boardroom is for you.
Related tools and guides. Charging for the invisible work (the four lines and their wording), How many revision rounds to include, The three revision emails, Case study: the missing boundary, Drop the scope, not the price, How to push back on a client without losing them, Quote checklist, How to price a video project, Anatomy of a Profitable Quote.